Royal Surrey County Hospital Chiller Plant
A great project and a complete success at every stage from design to installation.
We manufactured and used approximately 45m² of our 100mm thick acoustic panelwork and associated steelwork to form a 2.7m high roof top screen.
The modular panelwork was supplied with a galvanised absorptive inner face towards the chiller plant, with a Plastisol (Colorcoat) decorative outer finish and access through the screen to the chiller plant was via a Noico steel door.
In addidtion, an extra 13m² of 100mm galvanised absortive wall lining was installed to help reduce reverberant noise build up.
Please call today to find out more or to arrange for a FREE quotation.
Find out more